
Home/Modular Homes by City/Cobalt
Serving the Town of Cobalt (Timiskaming District)
Modular Homes & Garden Suites in Cobalt, Ontario
Factory-direct modular homes and backyard garden suites for the Town of Cobalt, the silver-mining town on Highway 11B between Temiskaming Shores and Latchford. Cobalt's Zoning By-law 2022-24 calls a garden suite an "accessory dwelling unit" (the province's term is additional residential unit, or ADU), and it allows one in a separate building in the yard of a house in every residential zone and the Rural zone. Here's what the by-law allows, what it costs, and the local catch: old mine workings.
Last updated
What you can build in Cobalt
Full modular homes — from $175,696. 29 models from 560 to 1,405 sq ft, 1–3 bedrooms — factory-built to the Ontario Building Code and set on a permanent foundation (a real, permanent house, not a “trailer”).
Building a main house in Cobalt? Cobalt's zoning by-law doesn't allow a CSA Z240MH manufactured home, which is what these full-size models are, as the main house in its ordinary residential zones (a few zones are different, so check your lot). ModularHomes400 has main-house alternatives coming. Tell us about your lot and we'll recommend one as they arrive. Backyard suites follow their own rules, below.
Backyard suites (ADUs) — from $96,244. 7 compact models built for garden-suite and in-law-suite use, sized to fit what Cobalt's by-law allows.
All homes are CSA-certified (A277 modular / Z240MH manufactured), finished in the factory, and delivered ready for foundation and hook-up. What's the difference between modular, manufactured, and mobile? →
Find your backyard suite — 3 quick questions
We'll narrow the models that fit a typical Cobalt backyard allowance to the ones that fit your life. No email needed.
1 · Who's it for?
2 · What layout?
3 · What size feels right? (Cobalt lots typically allow up to no fixed cap)
Cobalt sets no square-metre cap: the suite can be up to 80% of your house's floor area. In the R1 zone all accessory buildings together, the suite included, may cover 10% of the lot. That's 36 m² (≈388 sq ft) on the smallest 360 m² R1 lot and 60 m² (≈646 sq ft) on a 600 m² lot, less any garage or shed. Enter your address for the specifics. Your exact lot may allow more or less — get the real number for your address in seconds.
Check your exact Cobalt address →Can you put a garden suite (ADU) in your Cobalt backyard?
Yes, beside a house in the R1, R2, R3 and Rural zones. The by-law allows one unit in a separate building in the yard, as well as up to two in the house, once the house is built. The specifics, from Town of Cobalt Zoning By-law 2022-24, §3.2.5 Accessory Dwelling Units, with §3.2 accessory buildings (June 2025 office consolidation):
| Where it goes | Beside a single-detached, semi-detached or townhouse home in the Residential Type One, Two and Three (R1, R2, R3) and Rural (RU) zones (§3.2.5). One unit in the yard; with two units in the house and one in the yard, no more are allowed. Not in the Hazard (HZ) zone, which allows only existing homes. |
|---|---|
| Max size | No square-metre cap: up to 80% of your house's gross floor area (§3.2.5(v)). In R1, all accessory buildings together may cover 10% of the lot (§4.1.2(iv)); in R2 and R3, 75% of the house or 10% of the lot, whichever is greater (§4.2.2(iv)); on a Rural lot, 5% of the lot up to 150 m² (§4.4.2(vi)). |
| Height | 5.0 m (≈16 ft), from the average grade to the highest part of the building (§3.2.3). |
| Setbacks | In the side or rear yard: 1.0 m (≈3.3 ft) from the side lot line, 1.5 m (≈5 ft) from the rear lot line and 2 m (≈6.6 ft) from the house (§3.2.6), and never closer to the street than the house. 30 m (≈98 ft) from a lake or watercourse (§3.22.3). |
| Parking | One space for the suite (§3.13.1); gravel is fine for four or fewer units. |
| Servicing | Most of Cobalt is on Town water and sewer. A home on a well and septic is allowed only in the R1 zone (§3.19), and the Timiskaming Health Unit (Northeastern Public Health) issues the septic permit. |
| Mine hazards | The Official Plan says virtually all of Cobalt is within 1,000 m of an abandoned mine hazard site (§2.7.1). Land with an H1 holding symbol can't be built on until the hazard has been assessed (§4.14). Ask the Town office about your lot first. |
Check your specific Cobalt address →
Garden suite, laneway suite, in-law suite, ARU, ADU — different names for the same thing: a small, self-contained home in the backyard. New to the idea? Start with prefab garden suites for Ontario — what one costs in Cobalt, and the models that fit →
Cobalt's by-law is verified in our checker, so you can check if a garden suite is allowed at your Cobalt address in about a minute.
Getting your building permit in Cobalt
An eligible lot still needs a building permit before anything is delivered. Here's how Cobalt's process actually works — verified against the Cobalt building department's own pages.
How do you apply for an ADU building permit in Cobalt?
Through Paper application at the Town of Cobalt Municipal Office (plan review and inspections by the Temiskaming Municipal Services Association) (application portal ↗). Download the Building Permit Application from the Building Department tab of the Town's Municipal Services page, or pick one up at the Municipal Office, 18 Silver Street (705-679-8877), and submit it there with the deposit. The Town checks zoning; the Temiskaming Municipal Services Association (TMSA, 705-563-2426) reviews the plans against the Building Code and does the inspections; the Health Unit reviews any septic work. Cobalt's building-permit page ↗
- Call the Town office to confirm your lot's zone: under Zoning By-law 2022-24 §3.2.5 a unit in a separate building is permitted beside a house in the R1, R2, R3 and Rural zones, and ask whether your lot is near a mine hazard or carries an H1 holding symbol
- Check servicing. In R2, R3 and Rural the lot must be on municipal water and sewer (§3.19); on an R1 lot with a septic, apply to the Timiskaming Health Unit (Northeastern Public Health) for a sewage-system permit
- Have drawings prepared to scale: site plan, foundation drawings, floor layout, structural cross-section and elevations, plus mechanical drawings where they apply
- Call Ontario One Call for locates, then submit the application with two copies of the drawings and the deposit at the Municipal Office
- The Town reviews zoning, TMSA reviews the Building Code, and outside agencies (the Health Unit, the Electrical Safety Authority) review their parts; revise and resubmit if asked
- Pick up the permit and call TMSA for each inspection; the permit expires if work hasn't started within 6 months
What does an ADU permit application in Cobalt need?
- Completed Town of Cobalt Building Permit Application (the provincial Application for a Permit to Construct or Demolish)
- Letter of authorization, if an agent applies for the owner
- Completed Building Permit Sign-Off
- Two copies of the drawings: site plan, floor plans, exterior elevations, cross-sections and mechanical (HVAC, plumbing, electrical)
- Health Unit sewage-system permit, on an R1 lot with a septic
How much does an ADU building permit cost in Cobalt?
Estimate: under By-law 2025-38 (in force January 1, 2026) the building permit is $9.25 per $1,000 of the contract price. Without a written contract price it's $1.30 per sq ft for a dwelling, prefabricated homes included, so a typical 600 sq ft garden suite would be about $780. There's a $90 deposit per application and a $90 minimum. Starting work before the permit adds an administration charge of 1.5 times the fee. A septic permit is extra and set by the Health Unit. Confirm the figures with the Town before you budget.
| Building permit (By-law 2025-38, Schedule "A", 2026) | $9.25 per $1,000 of contract price; without a contract price, $1.30 per sq ft for a dwelling (code RA, prefabricated homes included); $90 minimum |
|---|---|
| Application deposit | $90 per application |
| Water connection (User Fee By-law 2023-33, 2026) | $55 connection fee per request; annual water and sewer rates apply after |
| Sewage-system permit (Timiskaming Health Unit), R1 septic lots only | Set by the Health Unit's own fee schedule |
We found no development charges by-law on the Town's by-law page, and the Development Charges Act exempts one unit in a detached building accessory to a house in any case.
How long does an ADU building permit take in Cobalt?
Ontario's Building Code requires a decision on a complete house-class application within 10 business days. A detached backyard suite is a house-class (Ontario Building Code Part 9) permit, so the legislated review window is 10 business days once the application is complete. The Town publishes no typical turnaround; add time for a Health Unit septic permit where one is needed.
Registration: No separate registration of additional units was found for Cobalt. The building permit is the approval; ask the Town whether the suite needs its own civic address.
Worth knowing before you apply
- Ask about mine hazards first: the Official Plan says virtually all of Cobalt is within 1,000 m of an abandoned mine hazard site (§2.7.1), and land with an H1 holding symbol can't be built on until the hazard is assessed (§4.14)
- In R2, R3 and Rural, a home needs municipal water and sewer; only R1 allows a septic (§3.19)
- In R1, all accessory buildings together may cover only 10% of the lot (§4.1.2(iv)), which is usually the real size limit
- Build to CSA A277 (modular) or on site: a CSA Z240 home is a "mobile home" allowed only in the mobile-home zone (§3.25)
- Ask for an accessory dwelling unit in an accessory building (§3.2.5), not a "garden suite", which this by-law defines as a portable unit
- Electrical work needs a separate permit from the Electrical Safety Authority
Fees and timelines are estimates from Cobalt's published schedules, verified November 17, 2026. Rates and processes change — always confirm current requirements with the building department before you apply.
A garden suite on a well and septic in Cobalt
Can I add a garden suite on a septic system in Cobalt?
Yes, if your septic system can carry the house and the suite together. A garden suite with a kitchen and bathroom adds a new source of sewage, so a qualified septic designer checks the combined load before you order. If the system has room, the suite can connect to it; if not, it may need to be altered, expanded or replaced.
In Cobalt: The septic check has to be in writing (a septic capacity letter) before the building permit is issued.
Who approves septic systems in Cobalt?
Timiskaming Health Unit (Northeastern Public Health), the local health unit, approves septic systems in Cobalt, so the septic review is a separate desk from the building permit.
Timiskaming Health Unit (Northeastern Public Health): septic permits ↗ · 1-877-442-1212
What to gather, and why even a small suite needs the check: our guide to garden suites on a septic system →
From Timiskaming Health Unit (Northeastern Public Health)’s own page, checked November 17, 2026. Confirm with them before you apply.
Grants & financing in Cobalt
See every program → Ontario ADU Grants Directory
A modular or prefab home on a permanent foundation is financed like any house. CMHC Prefab Plus allows an insured mortgage with as little as 5% down on the first $500,000, with up to four progress advances. How modular home financing works →
Adding the suite to a home you already own? CMHC Refinance can help homeowners add a secondary suite to their existing home. How CMHC Refinance works →
Thinking of the suite as a rental? Run the numbers →
Cobalt modular homes — FAQ
Can you build a garden suite in Cobalt, Ontario?
Yes. Cobalt's Zoning By-law 2022-24 (§3.2.5) allows one accessory dwelling unit in a separate building in the yard of a single-detached, semi-detached or townhouse home in the R1, R2, R3 and Rural zones, once the house is built. Land zoned Hazard (HZ) allows only existing homes, and land with an H1 holding symbol waits on a mine-hazard assessment, so ask the Town office about your lot first.
How big can a garden suite be in Cobalt?
There's no fixed cap: the suite can be up to 80% of your house's gross floor area. In the R1 zone all accessory buildings together, the suite included, may cover no more than 10% of the lot, so a 600 m² lot allows 60 m² (≈646 sq ft) less any garage or shed. It's up to 5.0 m (≈16 ft) tall.
How much is a building permit for a garden suite in Cobalt?
Under By-law 2025-38 (2026) the permit is $9.25 per $1,000 of the contract price, or $1.30 per sq ft for a dwelling where there's no written contract price, so roughly $780 for a 600 sq ft suite, with a $90 deposit. That's an estimate: confirm with the Town office before you budget.
Can you put a modular home in Cobalt, Ontario?
Yes. The by-law counts a CSA A277 modular home as a dwelling unit, as the main house or as a garden suite. A home built to CSA Z240 is a "mobile home" under the by-law and is allowed only in the mobile-home exception zone, so elsewhere it needs a rezoning.
How much does a modular home or backyard suite cost in Cobalt?
Modular home models start at $175,696 and run to about $338,000 for the largest layouts; backyard ADU models start at $96,244. Site work, foundation, delivery, and permits are additional.
Can I get a mortgage on a modular home in Cobalt?
Yes — on a permanent foundation it is financed as real property, including via CMHC Prefab Plus (5% down on the first $500,000).
Local rules summarized from Town of Cobalt Zoning By-law 2022-24, §3.2.5 Accessory Dwelling Units, with §3.2 accessory buildings (June 2025 office consolidation); verified by Modular Homes 400 and reviewed by James Clarke, REALTOR®. Always confirm current requirements with the municipality before you build.