Now law: the full 13% HST back on a new modular home
A modern modular home with wood and white cladding on a permanent foundation in a leafy Ontario backyard at golden hour

Home/Modular Homes by City/Deep River

Serving the Town of Deep River (Renfrew County)

Modular Homes & Garden Suites in Deep River, Ontario

Factory-direct modular homes and backyard suites for the Town of Deep River, on the Ottawa River in Renfrew County. Deep River's 2024 Zoning By-law permits a garden suite (the by-law calls it an additional dwelling unit) in a backyard building on any lot with a house, semi or row house, with a building permit as the only approval. There's no square-metre cap: the limit is how much of your lot the yard buildings may cover. Here's what the by-law allows, what it costs, and the rules that apply.

Last updated

What you can build in Deep River

Full modular homes — from $175,696. 29 models from 560 to 1,405 sq ft, 1–3 bedrooms — factory-built to the Ontario Building Code and set on a permanent foundation (a real, permanent house, not a “trailer”).

Building a main house in Deep River? Deep River's zoning by-law doesn't allow a CSA Z240MH manufactured home, which is what these full-size models are, as the main house. ModularHomes400 has main-house alternatives coming. Tell us about your lot and we'll recommend one as they arrive. Backyard suites follow their own rules, below.

Backyard suites (ADUs) — from $96,244. 7 compact models built for garden-suite and in-law-suite use, sized to fit what Deep River's by-law allows.

All homes are CSA-certified (A277 modular / Z240MH manufactured), finished in the factory, and delivered ready for foundation and hook-up. What's the difference between modular, manufactured, and mobile? →

Modular Match

Find your backyard suite — 3 quick questions

We'll narrow the models that fit a typical Deep River backyard allowance to the ones that fit your life. No email needed.

1 · Who's it for?

2 · What layout?

3 · What size feels right? (Deep River lots typically allow up to ~540 sq ft)

Deep River caps all accessory buildings together at 10% of the lot, garage and sheds included. On the 500 m² R2 minimum lot that is a 50 m² (≈540 sq ft) footprint if the suite is the only accessory building; the 600 m² R1 minimum allows 60 m² (≈645 sq ft). One storey, 4.5 m tall. Enter your address for the specifics. Your exact lot may allow more or less — get the real number for your address in seconds.

Check your exact Deep River address →

Can you put a garden suite (ADU) in your Deep River backyard?

Often, yes — Deep River permits a detached Additional Residential Unit on most serviced residential lots. The specifics, from Town of Deep River Zoning By-law 07-2024, §3.25 — Additional Dwelling Units (passed February 21, 2024):

Max sizeNo fixed m² cap. The real limit is coverage: all accessory buildings together may cover no more than 10% of the lot (§3.4.1(f)). On the 500 m² R2 minimum lot that is 50 m² (≈540 sq ft); the 600 m² R1 minimum allows 60 m² (≈645 sq ft); an existing garage or shed comes off the top. The zone’s cap for everything on the lot also applies (40% in R1 and R2).
Where it appliesOn a lot with a single-detached, semi-detached or row house, in any zone that allows one: Residential One, Two and Three (R1, R2, R3), row houses in R4, Estate Residential, Rural and Development (§3.25). On town water and sewer: one unit in the yard plus one in the house, or up to two in the house if the yard building holds none.
Height & setbacksOne storey, max 4.5 m (≈15 ft) (§3.4.1(d)); where the house has two or more storeys the unit may go on a second storey, such as over a garage (§3.25(v)). Not in the front yard and not in the zone’s required yards: in R1, R2 and R3, 1.2 m (≈4 ft) interior side, 4.5 m exterior side and 10 m (≈33 ft) rear. At least 1.8 m (≈6 ft) from the house.
Parking1 extra space for the unit (§3.25(iv)), on top of the house’s two.
ServicingOn a private well or septic: one unit only, on the same lot as the house, and the lot must be larger than 0.8 ha (≈2 acres) (§3.25(ii)); the building permit needs proof the systems can serve it (Official Plan §3.18). The Town’s Building Department issues its own septic permits.
ConservationNo conservation authority is named for Deep River. The flood rules are in the by-law: no development below the Ottawa River floodway (114.2 m G.S.C.), floodproofing to 115.5 m in the flood fringe with a surveyor’s elevation survey, and a 30 m (≈98 ft) setback from the high-water mark for every building and septic system (§3.21, §3.27).

Check your specific Deep River address →

Garden suite, laneway suite, in-law suite, ARU, ADU — different names for the same thing: a small, self-contained home in the backyard. New to the idea? Start with prefab garden suites for Ontario — what one costs in Deep River, and the models that fit →

Deep River's by-law is verified in our checker, so you can check if a garden suite is allowed at your Deep River address in about a minute.

Permits

Getting your building permit in Deep River

An eligible lot still needs a building permit before anything is delivered. Here's how Deep River's process actually works — verified against the Deep River building department's own pages.

How do you apply for an ADU building permit in Deep River?

Through an emailed application to the Chief Building Official (Town of Deep River Building Department, 100 Deep River Road; 613-584-2000 ext. 106). Download the Town's Building Permit Application (the provincial form) from the Building Department page, fill it in and email it with your drawings to the Chief Building Official, Robert Labre (rlabre@deepriver.ca). The Building Inspector replies by phone or email once the application is received. The Town issues its own sewage-system (septic) permits, using its own Sewage System Permit Application. Deep River's building-permit page ↗

  1. Confirm zoning and servicing: a garden suite is permitted in an accessory building on a lot with a single-detached, semi-detached or row house under Zoning By-law 07-2024 §3.25. On town water and sewer you can have one unit in the yard plus one in the house; on a private well or septic, one unit only, on a lot larger than 0.8 ha.
  2. Check the size rules on your lot: one storey, 4.5 m tall, outside the zone's required side and rear yards, at least 1.8 m from the house, and all accessory buildings together no more than 10% of the lot (§3.4.1, §3.25).
  3. Near the Ottawa River, check the floodplain: nothing below 114.2 m G.S.C., and in the flood fringe the building must be floodproofed to 115.5 m with an Ontario Land Surveyor's elevation survey (§3.21). Keep 30 m from the high-water mark (§3.27).
  4. On a well or septic lot, have a qualified designer confirm the system can serve the added unit (Official Plan §3.18) and apply for a Sewage System Permit if it needs a new or upgraded system.
  5. Have Building Code drawings prepared, then email the completed Building Permit Application, site plan, survey, lot grading plan and drawings to the Chief Building Official.
  6. Book inspections through construction.

What does an ADU permit application in Deep River need?

  • Building Permit Application (provincial Application for a Permit to Construct or Demolish, the Town's 2026 form), with designer information
  • Site plan showing all existing and proposed buildings and their distances to the lot lines
  • An up-to-date survey of the property by a licensed surveyor
  • Lot grade control plan showing finished grades and the direction of surface water flow
  • Two sets of drawings: foundation plan, floor plans, elevations, cross-sections, pre-engineered components, electrical, plumbing and heating/ventilation (residential mechanical ventilation design summary)
  • On a septic lot: Sewage System Permit Application with the site evaluation and system design by a qualified person (Schedule 2 installer form)

How much does an ADU building permit cost in Deep River?

From Schedule A of Building By-law 13-2023. New residential construction is $1.01 per sq ft ($45 minimum), so a typical ~540 sq ft (50 m²) garden suite is roughly $545. The same schedule's accessory-building rate is $0.24 per sq ft; we've asked the Town which line applies to a garden suite, so budget the higher one. No septic-permit fee is published online. A qualifying garden suite is exempt from the Town's wastewater development charge. All figures are estimates — confirm with the Chief Building Official (613-584-2000 ext. 106).

Building permit (residential new construction rate)$1.01 per sq ft of floor area (≈$545 for ~540 sq ft / 50 m²); $45 minimum (Building By-law 13-2023, Schedule A)
Accessory-building rate (if the Town applies it)$0.24 per sq ft; $45 minimum — confirm which rate applies
Sewage System Permit (septic lots)Not published online — ask the Building Department
Development chargesEXEMPT for a qualifying unit in a detached ancillary building under the Development Charges Act — versus $4,560 wastewater charge for a new single-detached house in the serviced area (2026 rates, By-law 40-2022)

Deep River charges one development charge, for wastewater: $4,560 per single- or semi-detached house in the serviced area in 2026 (By-law 40-2022, indexed each January). The Town's pamphlet exempts the creation of additional units where the conditions are met, and the Development Charges Act exempts one residential unit in a detached ancillary building.

How long does an ADU building permit take in Deep River?

Ontario's Building Code requires a decision on a complete house-class application within 10 business days. On a flood-fringe lot near the Ottawa River, have the surveyor's elevation survey in hand before you apply.

Worth knowing before you apply

  • There's no square-metre cap, but all accessory buildings together (garage and sheds included) can cover only 10% of the lot
  • One storey and 4.5 m tall, unless the house has two or more storeys — then a unit can go on a second storey, such as over a garage (height to confirm with the Town)
  • On a private well or septic: one unit only, on a lot larger than 0.8 ha (about 2 acres), with proof the systems can serve it
  • Along the Ottawa River the floodplain rules are in the zoning by-law: nothing below 114.2 m, floodproofing to 115.5 m, and a surveyor's elevation survey with the permit
  • A mobile home on its own chassis can't be the unit; a modular home on a permanent foundation can

Fees and timelines are estimates from Deep River's published schedules, verified November 8, 2026. Rates and processes change — always confirm current requirements with the building department before you apply.

Check what your Deep River lot allows first →Talk to our team about your build
Well & septic

A garden suite on a well and septic in Deep River

Can I add a garden suite on a septic system in Deep River?

Yes, if your septic system can carry the house and the suite together. A garden suite with a kitchen and bathroom adds a new source of sewage, so a qualified septic designer checks the combined load before you order. If the system has room, the suite can connect to it; if not, it may need to be altered, expanded or replaced.

In Deep River: The septic check has to be in writing (a septic capacity letter) before the building permit is issued; on a well and septic the lot must be at least 0.8 ha (about 2 acres).

Who approves septic systems in Deep River?

The Town of Deep River Building Department approves septic systems itself, so the septic review and the building permit both go through the municipality.

Town of Deep River Building Department: septic permits ↗ · 613-584-2000 ext. 106 · rlabre@deepriver.ca

What to gather, and why even a small suite needs the check: our guide to garden suites on a septic system →

From Town of Deep River Building Department’s own page, checked November 6, 2026. Confirm with them before you apply.

Grants & financing in Deep River

Development-charge exemption for additional units — A new single-detached house in the serviced area pays a $4,560 wastewater development charge in 2026 (By-law 40-2022, indexed each January), but one unit in a detached backyard building is exempt under the provincial Development Charges Act, and the Town’s own pamphlet exempts additional units where the conditions are met.

See every program → Ontario ADU Grants Directory

A modular or prefab home on a permanent foundation is financed like any house. CMHC Prefab Plus allows an insured mortgage with as little as 5% down on the first $500,000, with up to four progress advances. How modular home financing works →

Adding the suite to a home you already own? CMHC Refinance can help homeowners add a secondary suite to their existing home. How CMHC Refinance works →

Thinking of the suite as a rental? Run the numbers →

Deep River modular homes — FAQ

Can you build a garden suite / ADU in Deep River?

Yes. Deep River’s Zoning By-law 07-2024 (§3.25) permits an additional dwelling unit in a backyard building on any lot with a single-detached, semi-detached or row house, in the zones that allow those homes, with a building permit as the only approval. It has to fit the 10%-of-lot accessory-coverage cap, stay one storey and 4.5 m tall, and sit at least 1.8 m from the house.

How big can a garden suite be in Deep River?

There’s no fixed m² cap. All accessory buildings together may cover no more than 10% of the lot, so a 500 m² lot allows 50 m² (≈540 sq ft) and a 600 m² lot 60 m² (≈645 sq ft), less any garage or shed. It’s one storey and max 4.5 m tall, unless the house has two or more storeys and the unit goes on a second storey. Enter your address for the specifics.

Can you build an ADU on well and septic in Deep River?

Yes, on a large lot. On a private well or septic the by-law allows one additional unit, on a lot larger than 0.8 hectares (≈2 acres), and the building permit needs proof that the well and septic can serve it. The Town’s Building Department issues the septic permit.

Can you put a modular home in Deep River, Ontario?

Yes. Deep River’s by-law counts a modular home built to the Building Code and set on a permanent foundation as a detached dwelling, as the main house or as a backyard unit. A mobile home on its own chassis is different: the by-law excludes it from every dwelling type and no zone permits one.

How much does a modular home or backyard suite cost in Deep River?

Modular home models start at $175,696 and run to about $338,000 for the largest layouts; backyard ADU models start at $96,244. Site work, foundation, delivery, and permits are additional.

Can I get a mortgage on a modular home in Deep River?

Yes — on a permanent foundation it is financed as real property, including via CMHC Prefab Plus (5% down on the first $500,000).

Local rules summarized from Town of Deep River Zoning By-law 07-2024, §3.25 — Additional Dwelling Units (passed February 21, 2024); verified by Modular Homes 400 and reviewed by James Clarke, REALTOR®. Always confirm current requirements with the municipality before you build.

Find your match in 90 seconds →Talk to our team