Come see the Kubie 160: viewings from Dec 1. Book a time
A modern modular home with wood and white cladding on a permanent foundation in a leafy Ontario backyard at golden hour

Home/Modular Homes by City/Merrickville-Wolford

Serving the Village of Merrickville-Wolford (Merrickville, Wolford Centre, Eastons Corners, Snowdons Corners — Leeds and Grenville)

Modular Homes & Garden Suites in Merrickville-Wolford, Ontario

Factory-direct modular homes and backyard suites for the Village of Merrickville-Wolford — the Rideau Canal village of Merrickville and the rural Wolford countryside around it. Zoning By-law 33-25 (2025) permits an additional residential unit as-of-right in its own building in the Residential R2 and R3, Hamlet and Rural zones. The village core is on municipal water and sewer; most of Wolford is on a private well and septic. Here's what the by-law allows, what it costs, and the rules that apply.

Last updated

What you can build in Merrickville-Wolford

Full modular homes — from $175,696. 29 models from 560 to 1,405 sq ft, 1–3 bedrooms — factory-built to the Ontario Building Code and set on a permanent foundation (a real, permanent house, not a “trailer”).

Backyard suites (ADUs) — from $96,244. 7 compact models built for garden-suite and in-law-suite use, sized to fit what Merrickville-Wolford's by-law allows.

All homes are CSA-certified (A277 modular / Z240MH manufactured), finished in the factory, and delivered ready for foundation and hook-up. What's the difference between modular, manufactured, and mobile? →

Modular Match

Find your backyard suite — 3 quick questions

We'll narrow the models that fit a typical Merrickville-Wolford backyard allowance to the ones that fit your life. No email needed.

1 · Who's it for?

2 · What layout?

3 · What size feels right? (Merrickville-Wolford lots typically allow up to ~600 sq ft)

Merrickville-Wolford sets no fixed floor-area cap for a garden suite: all outbuildings together may cover 10% of the lot, and no more than 140 m² (1,507 sq ft) in the R2 and R3 zones (§3.1.4). The unit can be up to 6.1 m tall. Enter your address for the specifics. Your exact lot may allow more or less — get the real number for your address in seconds.

Check your exact Merrickville-Wolford address →

Can you put a garden suite (ADU) in your Merrickville-Wolford backyard?

Often, yes — Merrickville-Wolford permits a garden suite in its own building beside a single detached, semi-detached, duplex or townhouse dwelling in the R2, R3, Hamlet and Rural zones. The specifics, from Village of Merrickville-Wolford Zoning By-law 33-25 (Office Consolidation, November 2026), §3.2 — Additional Residential Units:

Max sizeNo fixed floor-area cap. All accessory buildings together may cover up to 10% of the lot, and in the R2 and R3 zones no more than 140 m² (≈1,507 sq ft) (§3.1.4). Up to two extra units per property, at most one in a separate building (§3.2.7).
Where it goesR2, R3, Hamlet and Rural zones, on a lot that meets the zone’s minimum lot area and frontage and fronts on a public road maintained year-round. Not on flood-prone or hazard land, and not in the EP zone (§3.2.1–3.2.4).
Height & setbacksUp to 6.1 m (≈20 ft); 1.5 storeys over a garage (§3.1.3, §3.2.11). At least 3 m (≈10 ft) from the side and rear lot lines (§3.1.2), and 2 m (≈6.5 ft) from the house — 4 m (≈13 ft) in the village on municipal services (§3.1.5, §3.2.6).
Parking1 extra space, using the house’s driveway (§3.2.9, §3.2.10).
ServicingIn the village, connect to municipal water and sewer (§3.2.14). On a well and septic, share the house’s systems if they can carry the load or add your own; a separate septic on a lot under 0.4 ha (≈1 acre) needs a hydrogeological assessment (§3.2.13, §3.2.16). The Village’s Building Department issues the septic permit.
Water & conservationBuildings and septic beds keep 30 m (≈98 ft) from the high-water mark of a lake, river or the Rideau Canal (§3.29.2) and 30 m from an EP-zoned wetland (§3.29.4). Rideau Valley Conservation Authority policies govern the flood plain.

Check your specific Merrickville-Wolford address →

Garden suite, laneway suite, in-law suite, ARU, ADU — different names for the same thing: a small, self-contained home in the backyard. New to the idea? Start with prefab garden suites for Ontario — what one costs in Merrickville-Wolford, and the models that fit →

Merrickville-Wolford's by-law is verified in our checker, so you can check if a garden suite is allowed at your Merrickville-Wolford address in about a minute.

Permits

Getting your building permit in Merrickville-Wolford

An eligible lot still needs a building permit before anything is delivered. Here's how Merrickville-Wolford's process actually works — verified against the Merrickville-Wolford building department's own pages.

How do you apply for an ADU building permit in Merrickville-Wolford?

Through The Village's online building permit application (hosted on cgis.com), or paper/email to the Building Department (application portal ↗). Apply through the "Online Building Permit Application" link on the Village's Building Department page, or submit the application with two sets of plans (one digital set for a paper submission) to the Municipal Office, 317 Brock Street West, Merrickville. The non-refundable deposit is paid with the application. The Chief Building Official is at 613-269-4791 ext. 258 and cbo@merrickville-wolford.ca. Merrickville-Wolford's building-permit page ↗

  1. Check your lot's zone on the Village's Public Planning Map and confirm the unit fits Zoning By-law 33-25 §3.2 (R2, R3, Hamlet or Rural zone, minimum lot area and frontage, year-round public road) before you order drawings
  2. On a well and septic, confirm the existing well and septic can carry the unit or design a new system, and apply to the Village's Building Department for the sewage system permit; a separate septic on a lot under 0.4 ha needs a hydrogeological assessment first
  3. Near a lake, river, the Rideau Canal, a wetland or a flood plain, contact the Rideau Valley Conservation Authority (613-692-3571) before you apply; on a County road, get the County's setback and entrance approval
  4. Have a qualified designer (or a Professional Engineer where required) prepare the plans, a site plan and the Application for a Permit to Construct or Demolish with its schedules
  5. Submit online or at the Municipal Office with the non-refundable deposit, then pay the balance of the permit fee before the permit is issued
  6. Book each inspection with the Building Department at least two business days ahead, through to the final inspection; the permit is valid for one year

What does an ADU permit application in Merrickville-Wolford need?

  • Completed Application for a Permit to Construct or Demolish, with Schedule 1 for each designer and Schedule 2 where a sewage system is built or repaired
  • Two sets of construction plans (one digital set if you submit on paper)
  • Site plan showing existing and proposed setbacks to lot lines and other buildings, septic systems, wells, water and sewer services, easements, power lines and any neighbouring barns, pits or quarries
  • Written road-access approval from the Village's Roads Superintendent, the United Counties or the Province, as applicable
  • Deed or title, any severance conditions, and the Ontario New Home Warranty Plan Act declaration
  • A satisfactory soils bearing report, and the manufacturer's specifications for the HRV/ERV and furnace with the ventilation calculations
  • Payment of the permit fees, lot levy, culvert fee, civic number and any damage deposit

How much does an ADU building permit cost in Merrickville-Wolford?

Estimate only: the Village charges $17 per $1,000 of construction value (minimum $107) under Schedule H to Fees and Charges By-law 50-2025, effective February 1, 2026, so a garden suite valued at $150,000 would come to about $2,550 in building permit fees. The Chief Building Official sets the valuation. Add $848 for a new septic system permit if the unit needs its own system, and $100 to $200 for a new entrance. Fees rise each February 1, so confirm the current figures with the Building Department.

Non-refundable deposit (application/plan review), Schedule H$107, paid with the application
Building permit, all structures (Schedule H, effective Feb 1, 2026)$17 per $1,000 of construction value, minimum $107; the Chief Building Official may set the valuation (Building By-law 38-2024 s.7.5, 7.8)
Sewage system permit, private systems up to 10,000 L/day (Schedule H, Part Three)$848
Septic site inspection, including alterations and Class 2 & 3 systems (Schedule H, Part Three)$383
Entrance permit onto a Village road (Fees and Charges By-law 50-2025, Public Works)$100 without a culvert, $200 with a culvert
Permit renewal (permits expire after one year)$160 for the first renewal, $266 for the second, $531 after that
Building without a permit100% of the building permit fee, minimum $300 and maximum $5,000

The Development Charges Act, 1997 (s.2(3.2)–(3.3)) exempts one residential unit in a building ancillary to a detached, semi-detached or row house, and the Village's Development Charges By-law 45-2026 (s.3.5) repeats that exemption, so a qualifying garden suite should pay no development charge.

How long does an ADU building permit take in Merrickville-Wolford?

Ontario's Building Code requires a decision on a complete house-class application within 10 business days

Worth knowing before you apply

  • Fees are indexed every February 1; the figures here are Schedule H effective February 1, 2026
  • A permit is valid for one year from issue; a permit not closed within the year pays the renewal fee
  • Septic permits in Merrickville-Wolford come from the Village's own Building Department, not the Health Unit or the Conservation Authority
  • A separate septic system on a lot under 0.4 ha (about 1 acre) needs a hydrogeological assessment under Zoning By-law 33-25 §3.2.13 before the permit
  • Work near the Rideau Canal, a lake, river, wetland or flood plain may need Rideau Valley Conservation Authority or Parks Canada approval as well
  • If the unit doesn't meet the zoning setbacks or coverage, a minor variance ($750 plus disbursements) comes before the building permit
  • Electrical work needs a separate Electrical Safety Authority permit

Fees and timelines are estimates from Merrickville-Wolford's published schedules, verified November 26, 2026. Rates and processes change — always confirm current requirements with the building department before you apply.

Check what your Merrickville-Wolford lot allows first →Talk to our team about your build
Well & septic

A garden suite on a well and septic in Merrickville-Wolford

Can I add a garden suite on a septic system in Merrickville-Wolford?

Yes, if your septic system can carry the house and the suite together. A garden suite with a kitchen and bathroom adds a new source of sewage, so a qualified septic designer checks the combined load before you order. If the system has room, the suite can connect to it; if not, it may need to be altered, expanded or replaced.

In Merrickville-Wolford: The septic check has to be in writing (a septic capacity letter) before the building permit is issued.

Who approves septic systems in Merrickville-Wolford?

Village of Merrickville-Wolford Building Department approves septic systems itself, so the septic review and the building permit both go through the municipality.

Village of Merrickville-Wolford Building Department: septic permits ↗ · 613-269-4791 ext. 258 · cbo@merrickville-wolford.ca

What to gather, and why even a small suite needs the check: our guide to garden suites on a septic system →

From Village of Merrickville-Wolford Building Department’s own page, checked November 26, 2026. Confirm with them before you apply.

Grants & financing in Merrickville-Wolford

Development-charge exemption — The Development Charges Act exempts one unit in a building ancillary to a detached, semi-detached or row house, and the Village’s DC By-law 45-2026 repeats it, so a qualifying backyard suite pays no development charge. Confirm with the Village for your project.

See every program → Ontario ADU Grants Directory

A modular or prefab home on a permanent foundation is financed like any house. CMHC Prefab Plus allows an insured mortgage with as little as 5% down on the first $500,000, with up to four progress advances. How modular home financing works →

Adding the suite to a home you already own? CMHC Refinance can help homeowners add a secondary suite to their existing home. How CMHC Refinance works →

Thinking of the suite as a rental? Run the numbers →

Merrickville-Wolford modular homes — FAQ

Can you build a garden suite / ADU in Merrickville-Wolford?

Yes. Zoning By-law 33-25 (§3.2) permits an additional residential unit in its own building in the R2, R3, Hamlet and Rural zones, on a lot that meets the zone’s minimum size and fronts on a year-round public road. It can be up to 6.1 m tall, needs one extra parking space and a building permit, and isn’t allowed on flood-prone land or in the EP zone.

How big can a garden suite be in Merrickville-Wolford?

There is no fixed floor-area cap. All accessory buildings on the lot together may cover up to 10% of it, and in the R2 and R3 zones no more than 140 m² (about 1,507 sq ft). On a 4,000 m² (1-acre) rural lot that is up to 400 m² of outbuildings in all. Enter your address for the specifics.

Can you build an ADU on well and septic in Merrickville-Wolford?

Yes. The unit can share the house’s well and septic if they can carry the extra load, or have its own system; the Village needs confirmation either way. A separate septic on a lot under 0.4 ha (about 1 acre) needs a hydrogeological assessment. The Village’s own Building Department issues septic permits, and septic beds keep 30 m from a lake, river or the Rideau Canal.

Can you put a modular home in Merrickville-Wolford, Ontario?

A modular dwelling house is deemed a single detached house under the by-law. A home built to CSA Z240 is defined as a mobile home, which as a main house is limited to the Mobile Home Park zone or a farm-help dwelling on 40 ha or more, though it can be a garden suite on a foundation. Because the two definitions overlap for a multi-section Z240MH home, ask the Village how it treats your model before you order.

How much does a modular home or backyard suite cost in Merrickville-Wolford?

Modular home models start at $175,696 and run to about $338,000 for the largest layouts; backyard ADU models start at $96,244. Site work, foundation, delivery, and permits are additional.

Can I get a mortgage on a modular home in Merrickville-Wolford?

Yes — on a permanent foundation it is financed as real property, including via CMHC Prefab Plus (5% down on the first $500,000).

Local rules summarized from Village of Merrickville-Wolford Zoning By-law 33-25 (Office Consolidation, November 2026), §3.2 — Additional Residential Units; verified by Modular Homes 400 and reviewed by James Clarke, REALTOR®. Always confirm current requirements with the municipality before you build.

Find your match in 90 seconds →Talk to our team