
Home/Modular Homes by City/North Grenville
Serving the Municipality of North Grenville (Kemptville, Oxford Mills, Bishops Mills, Oxford Station — Leeds and Grenville)
Modular Homes & Garden Suites in North Grenville, Ontario
Factory-direct modular homes and backyard suites for the Municipality of North Grenville — Kemptville and the countryside around it, from Oxford Mills and Bishops Mills to Burritts Rapids on the Rideau. North Grenville's Zoning By-law 50-12 permits an additional residential unit as-of-right in a separate building in the yard, in the Agriculture, Rural, Rural Residential and R1 to R4 residential zones. Kemptville is on municipal water and sewer; most rural lots are on a private well and septic. Here's what the by-law allows, what it costs, and the rules that apply.
Last updated
What you can build in North Grenville
Full modular homes — from $175,696. 29 models from 560 to 1,405 sq ft, 1–3 bedrooms — factory-built to the Ontario Building Code and set on a permanent foundation (a real, permanent house, not a “trailer”).
Backyard suites (ADUs) — from $96,244. 7 compact models built for garden-suite and in-law-suite use, sized to fit what North Grenville's by-law allows.
All homes are CSA-certified (A277 modular / Z240MH manufactured), finished in the factory, and delivered ready for foundation and hook-up. What's the difference between modular, manufactured, and mobile? →
Find your backyard suite — 3 quick questions
We'll narrow the models that fit a typical North Grenville backyard allowance to the ones that fit your life. No email needed.
1 · Who's it for?
2 · What layout?
3 · What size feels right? (North Grenville lots typically allow up to ~600 sq ft)
North Grenville caps a garden suite at half your house’s floor area, with no fixed square-metre ceiling (§6.12(d)), so a 1,200 sq ft house allows about 600 sq ft. It can’t be taller than your house. Enter your address for the specifics. Your exact lot may allow more or less — get the real number for your address in seconds.
Check your exact North Grenville address →Can you put a garden suite (ADU) in your North Grenville backyard?
Often, yes — North Grenville permits a garden suite in its own building beside a single detached, semi-detached or townhouse dwelling in the Agriculture, Rural, Rural Residential and R1 to R4 zones. The specifics, from Municipality of North Grenville Comprehensive Zoning By-law 50-12 (consolidated to August 14, 2024), §6.12 — Dwelling Unit – Additional Residential Unit:
| Max size | Half the floor area of your house, with no fixed square-metre ceiling (§6.12(d)). Up to two extra units per house: both inside, or one inside and one in the yard. |
|---|---|
| Where it goes | In the side or rear yard, no closer to the street than the house (§6.12(k)). Not in the regulated flood plain, and not on a lot that already has a temporary garden suite or rooming units. |
| Height & setbacks | No taller than your house (§6.12(l)). At least 1.2 m (≈4 ft) from the side and rear lot lines, 2.4 m (≈8 ft) from a neighbour’s house and 1.2 m from your own house (§6.1.4, §6.1.5). |
| Parking | 1 extra space; tandem parking in the same driveway is fine, and the unit may have its own driveway if it meets the zone rules (§6.38.1, §6.12(e)). |
| Servicing | On a well and septic the lot must be at least 0.4 ha (≈1 acre) for a separate-building unit (§6.12(m)), and the Rideau Valley Conservation Authority must approve the septic before the building permit. In Kemptville, connect to municipal water and sewer. |
| Water & conservation | Buildings and septic systems keep 30 m (≈98 ft) from a lake, river or creek’s high-water mark (§6.25), 30 m from a significant wetland (§6.24) and 30 m from the Rideau Canal shoreline (§6.25.3). Rideau Valley Conservation Authority permission is needed near the flood line. |
Check your specific North Grenville address →
Garden suite, laneway suite, in-law suite, ARU, ADU — different names for the same thing: a small, self-contained home in the backyard. New to the idea? Start with prefab garden suites for Ontario — what one costs in North Grenville, and the models that fit →
North Grenville's by-law is verified in our checker, so you can check if a garden suite is allowed at your North Grenville address in about a minute.
Getting your building permit in North Grenville
An eligible lot still needs a building permit before anything is delivered. Here's how North Grenville's process actually works — verified against the North Grenville building department's own pages.
How do you apply for an ADU building permit in North Grenville?
Through Email or in-person/mail submission to the Municipality's Building Division (online application portal listed as "coming soon"). Email the completed application and all required documents to buildingappsubmit@northgrenville.on.ca, or deliver or mail them to 285 County Rd 44, Kemptville (P.O. Box 130, K0G 1J0). The base fee is due at application and the Building Department accepts only cash, debit or cheque. The Building Department is at 613-258-9569 ext. 130 and building@northgrenville.on.ca. The Municipality's site lists an online Building Permit Application Portal as "coming soon", so check the page for a live portal before you apply. North Grenville's building-permit page ↗
- Check the zoning for your lot on the Municipality's zoning map, or email planning@northgrenville.on.ca (613-258-9569 ext. 116), and confirm the unit fits the Zoning By-law before you order drawings
- On a rural lot, get septic approval first: the Rideau Valley Conservation Authority (RVCA) reviews the existing system's capacity for a second unit, or permits a new one; on an urban lot, file the Water/Sewer Connection Permit Application
- If the lot is in a flooding or erosion zone or within 120 m of the flood line, get written permission or a permit from the RVCA before you apply to the Building Division
- Have a qualified designer prepare the plans and complete the Application for a Permit to Construct or Demolish with Schedule 1 Designer Information, the Energy Efficiency Design Summary and the HVAC (heat loss and ventilation) documents
- Email or deliver the application, two sets of plans (or an electronic submission) and the other required documents, and pay the base fee
- An inspector reviews the application within approximately 10 business days and contacts you about anything missing; pay any balance of the permit fee before the permit is issued
- Book inspections (48 hours' notice) with the Inspection Request Form or 613-258-9569 ext. 130 as the permit lists them, through to the final inspection and closing of the permit
What does an ADU permit application in North Grenville need?
- Application for a Permit to Construct or Demolish, including Schedule 1 Designer Information (a homeowner who designs the project writes "Homeowner exemption" on the form)
- Site plan and building plans: two full sets, or an electronic submission accepted by the Building Division
- Energy Efficiency Design Summary (prescriptive or performance) and HVAC documents (HRAI design and ventilation layouts, heat loss and gain)
- Deed or tax bill as proof of ownership, and a letter of authorization if an agent applies for you
- Rural lots: RVCA septic approval, plus a well driller's certificate and the Well Construction Agreement; urban lots: Water/Sewer Connection Permit Application
- Engineered lot grading plan (subdivision lots) or a site plan (rural lots), and ICF design details by a qualified individual if the building is ICF
- Payment of the base fee by cash, debit or cheque
How much does an ADU building permit cost in North Grenville?
Estimate only: the Municipality's 2024 building fee schedule (By-law 1-21, Schedule "A", updated January 1, 2024) has no line written for a detached additional unit, and its two candidate lines give different results for a typical ~600 sq ft suite, so which line applies is to be confirmed with the Building Department before you budget. The two candidates are Residential Group C single-family at "$2,600 + $0.75/ft2 >1,500 ft2" and Accessory Buildings/Structures at "$325 + $0.75/ft2 > 300 ft2"; the schedule also says a cost-of-living adjustment applies each January 1, so the current figures may be higher. Add the conservation authority's septic fee: about $990 plus $155 for a new Class 4 system in 2026 ($1,015 plus $160 from January 1, 2027), or about $350 in 2026 ($360 in 2027) to review whether an existing system can take the added unit.
| Building permit, residential single-family (Schedule "A" 2024, line A.3.a) - one candidate line | "$2,600 + $0.75/ft2 >1,500 ft2"; unclear whether the $2,600 base covers the first 1,500 sq ft or applies alongside a per-sq-ft rate, and whether this line covers a detached second unit is not confirmed |
|---|---|
| Building permit, accessory buildings/structures (Schedule "A" 2024, line A.8.a) - the other candidate line | "$325 + $0.75/ft2 > 300 ft2" for a detached garage, shed, boat house or other accessory building; whether it covers a dwelling is not confirmed |
| Base fee and balance | The base fee is due at application; the balance of the permit fee and any applicable development charges are paid before the permit is issued (Building By-law 2-21 s.13.1) |
| Plumbing (Schedule "A" 2024, items B.5 and B.6) | $85 flat basic plumbing fee and $17 per fixture; the schedule lists these under Alterations and Repairs, so confirm whether they are added to a new-construction permit |
| Septic permit, new Class 4 residential system (RVCA, Schedule E) | $990 plus $155 for the required maintenance contract registration (effective January 1, 2026); $1,015 plus $160 effective January 1, 2027 |
| Septic review when adding a unit to an existing system (RVCA Renovation/Change of Use, OBC Part 10 & 11) | $350 (2026) or $180 when filed with a Part 8 application; $360 or $185 from January 1, 2027 |
| Starting work before the permit | A surcharge equal to 100% of the permit fee, to a maximum of $5,000 (Building By-law 2-21 s.13.4); RVCA adds a 50% surcharge on septic permits |
The Municipality's Development Charges By-law 104-19 (s.3(3)(b)) does not apply to one secondary dwelling unit within an ancillary structure, and the Development Charges Act, 1997 (s.2(3.2)-(3.3)) exempts one residential unit in a detached ancillary building, so a qualifying backyard suite should pay no development charge. By-law 104-19 was due to expire on November 19, 2024 and the Municipality's page lists no replacement, so confirm with the Municipality before you budget.
How long does an ADU building permit take in North Grenville?
Ontario's Building Code requires a decision on a complete house-class application within 10 business days. The Building Department says an inspector will review a complete application within approximately 10 business days and contact you about anything outstanding; its FAQ adds that this is the time to first contact, not a promise of an issued permit, and that incomplete applications fall outside it. RVCA says septic reviews take 5 to 10 business days once it has all the information, and a septic approval comes before the building permit.
Worth knowing before you apply
- The fee schedule has no line for a detached additional unit and the nearest two lines differ; ask the Building Department which applies and what the current-year total is
- The only published schedule found (By-law 1-21, Schedule "A", updated January 1, 2024) says fees rise each January 1; ask for the current-year figures
- Septic in North Grenville is handled by the Rideau Valley Conservation Authority (613-692-3571), not the Health Unit; an older Building FAQ still points to the Health Unit, so follow the RVCA
- An RVCA Renovation/Change of Use approval is only a comment on the existing system's capacity, not permission to start construction
- Lots in a flooding or erosion zone, or within 120 m of the flood line, need RVCA permission before you apply to the Building Division
- If your project does not meet the Zoning By-law setbacks or sizes you need a minor variance ($650 under the 2024 planning fee schedule) before the building permit
- Start construction within 6 months of permit issue or the Municipality may revoke the permit; inspections after two years of issue carry a fee ($255 flat in the 2024 schedule)
- Electrical work needs a separate Electrical Safety Authority permit, and the ESA certificate is needed at your final inspection
- If the unit needs a new driveway onto a Municipal road, apply separately for a Municipal Roads Entrance Permit; County roads go to the United Counties of Leeds and Grenville
Fees and timelines are estimates from North Grenville's published schedules, verified November 26, 2026. Rates and processes change — always confirm current requirements with the building department before you apply.
A garden suite on a well and septic in North Grenville
Can I add a garden suite on a septic system in North Grenville?
Yes, if your septic system can carry the house and the suite together. A garden suite with a kitchen and bathroom adds a new source of sewage, so a qualified septic designer checks the combined load before you order. If the system has room, the suite can connect to it; if not, it may need to be altered, expanded or replaced.
In North Grenville: The septic check has to be in writing (a septic capacity letter) before the building permit is issued; on a well and septic the lot must be at least 0.4 ha (about 1 acre).
Who approves septic systems in North Grenville?
Rideau Valley Conservation Authority, the conservation authority, approves septic systems in North Grenville on the municipality’s behalf, so the septic review is a separate desk from the building permit.
Rideau Valley Conservation Authority: septic permits ↗ · 613-692-3571
What to gather, and why even a small suite needs the check: our guide to garden suites on a septic system →
From Rideau Valley Conservation Authority’s own page, checked November 26, 2026. Confirm with them before you apply.
Grants & financing in North Grenville
Development-charge exemption — The Development Charges Act exempts one unit in a building ancillary to a detached, semi-detached or row house, so a qualifying backyard suite pays no development charge. Confirm with the Municipality for your project.
See every program → Ontario ADU Grants Directory
A modular or prefab home on a permanent foundation is financed like any house. CMHC Prefab Plus allows an insured mortgage with as little as 5% down on the first $500,000, with up to four progress advances. How modular home financing works →
Adding the suite to a home you already own? CMHC Refinance can help homeowners add a secondary suite to their existing home. How CMHC Refinance works →
Thinking of the suite as a rental? Run the numbers →
North Grenville modular homes — FAQ
Can you build a garden suite / ADU in North Grenville?
Yes. Zoning By-law 50-12 (§6.12) permits an additional residential unit in its own building beside a single detached, semi-detached or townhouse dwelling, and lists it in the Agriculture, Rural, Rural Residential and R1 to R4 zones. It can be up to half the size of your house, no taller than the house, and needs one extra parking space and a building permit. It isn’t allowed in the flood plain.
How big can a garden suite be in North Grenville?
Half your house’s floor area, with no fixed square-metre cap. A 1,200 sq ft house allows about 600 sq ft. A suite within that limit may exceed the lot-coverage maximums as long as it meets the other zone rules. Enter your address for the specifics.
Can you build an ADU on well and septic in North Grenville?
Yes, on a lot of at least 0.4 ha (about 1 acre) for a separate-building unit. In the Rural Residential zone the unit connects to the servicing already on the lot. The Rideau Valley Conservation Authority approves septic in North Grenville; adding a unit usually means a capacity review and often a larger septic bed. No septic bed within 30 m of a lake, river or creek.
Can you put a modular home in North Grenville, Ontario?
A CSA A277 modular home is a dwelling like any other house under the by-law. A home built to CSA Z240 is a mobile home under the by-law and is allowed only in the Mobile Home Park zone or as a farm-help dwelling, and it can’t be a garden suite. The by-law’s “modular homes” definition also names Z240MH homes on a permanent foundation, so ask the Municipality how it treats your model before you order.
How much does a modular home or backyard suite cost in North Grenville?
Modular home models start at $175,696 and run to about $338,000 for the largest layouts; backyard ADU models start at $96,244. Site work, foundation, delivery, and permits are additional.
Can I get a mortgage on a modular home in North Grenville?
Yes — on a permanent foundation it is financed as real property, including via CMHC Prefab Plus (5% down on the first $500,000).
Local rules summarized from Municipality of North Grenville Comprehensive Zoning By-law 50-12 (consolidated to August 14, 2024), §6.12 — Dwelling Unit – Additional Residential Unit; verified by Modular Homes 400 and reviewed by James Clarke, REALTOR®. Always confirm current requirements with the municipality before you build.