Now law: the full 13% HST back on a new modular home
A modern modular home with wood and white cladding on a permanent foundation in a leafy Ontario backyard at golden hour

Home/Modular Homes by City/North Stormont

Serving the Township of North Stormont — Finch, Berwick, Crysler, Avonmore, Monkland & Moose Creek (SDG Counties)

Modular Homes & Garden Suites in North Stormont, Ontario

Factory-direct modular homes and backyard garden suites for the Township of North Stormont: Finch, Berwick, Crysler, Avonmore, Monkland, Moose Creek and the farm concessions between Cornwall and Ottawa. North Stormont's Zoning By-law 08-2014 calls a garden suite a "secondary unit" (the province's term is additional residential unit, or ADU), and it allows one in a separate building in the yard of a house in the village residential zones and on farm and rural lots. Here's what the by-law allows, what it costs, and the rules that apply.

Last updated

What you can build in North Stormont

Full modular homes — from $175,696. 29 models from 560 to 1,405 sq ft, 1–3 bedrooms — factory-built to the Ontario Building Code and set on a permanent foundation (a real, permanent house, not a “trailer”).

Building a main house in North Stormont? North Stormont's zoning by-law doesn't allow a CSA Z240MH manufactured home, which is what these full-size models are, as the main house in its ordinary residential zones (a few zones are different, so check your lot). ModularHomes400 has main-house alternatives coming. Tell us about your lot and we'll recommend one as they arrive. Backyard suites follow their own rules, below.

Backyard suites (ADUs) — from $96,244. 7 compact models built for garden-suite and in-law-suite use, sized to fit what North Stormont's by-law allows.

All homes are CSA-certified (A277 modular / Z240MH manufactured), finished in the factory, and delivered ready for foundation and hook-up. What's the difference between modular, manufactured, and mobile? →

Modular Match

Find your backyard suite — 3 quick questions

We'll narrow the models that fit a typical North Stormont backyard allowance to the ones that fit your life. No email needed.

1 · Who's it for?

2 · What layout?

3 · What size feels right? (North Stormont lots typically allow up to no fixed cap)

North Stormont sets no square-metre cap: the suite can be as big as your house, but no bigger. On a residential lot all accessory buildings together, the suite included, may cover 10% of the lot. That's about 45 m² (≈484 sq ft) on the smallest 450 m² fully serviced R1 lot in Finch, Crysler or Moose Creek and 100 m² (≈1,076 sq ft) on a 1,000 m² lot, less any garage or shed. On an Agricultural or Rural lot there's no accessory cap. Enter your address for the specifics. Your exact lot may allow more or less — get the real number for your address in seconds.

Check your exact North Stormont address →

Can you put a garden suite (ADU) in your North Stormont backyard?

Yes, beside a house in the R1 to R4 residential zones and on Agricultural and Rural lots. The by-law allows one secondary unit per house, inside it or in a separate building in the yard, once the house is built. The specifics, from Township of North Stormont Comprehensive Zoning By-law 08-2014, §3.15 Garden Suites & Dwelling - Secondary Units, with §3.1 accessory buildings (October 2021 consolidation):

Where it goesBeside a single-detached, semi-detached, duplex or end-unit townhouse in the R1, R2, R3 and R4 zones and in the Agricultural (AG) and Rural (RU) zones. One per house, and the house comes first (§3.15(1), (3)). Not in the Rural Residential (RR) or mobile-home zones, and never severed onto its own lot.
Max sizeNo square-metre cap: the suite can be no larger than your house (§3.15(7)). In a residential zone all accessory buildings together, the suite included, may cover no more than 10% of the lot (§3.1(8)). That's 45 m² (≈484 sq ft) on the smallest 450 m² fully serviced R1 lot, less any garage or shed. Agricultural and Rural lots have no accessory cap, only the zone's lot coverage (20% on a house lot).
Height5 m (≈16 ft) in every zone; 6.1 m (20 ft) on an Agricultural or Rural lot where the suite meets the house’s own yard setbacks (§3.1(6)).
Setbacks1.2 m (≈4 ft) from the side and rear lot lines (§3.1(7)), but 4 m (≈13 ft) from any line faced by a rear or side wall with a window or door (§3.15(10)). At least 3 m (≈10 ft) from the house (§3.15(11)), and never closer to the street than the house's required front yard. Along a County Road, 30 m from the road's centreline (§3.34(1)(b)).
ParkingOne space for the suite (§4.1). It shares the house's driveway entrance; a separate entrance is possible only on a corner lot, at the Township's discretion (§3.15(8)).
ServicingFinch, Crysler and Moose Creek are on municipal water and sewer, where a new connection needs a Township capacity allocation. Elsewhere the Township must be satisfied the well and septic are adequate (§3.15(6)), and South Nation Conservation issues the septic permit.
ConservationSouth Nation Conservation (SNC) for most of the Township and Raisin Region Conservation Authority (RRCA) in the south-east. Buildings and septic beds stay 15 m (≈49 ft) from the high-water mark or top of bank where no flood plain is mapped, and 30 m from fish habitat without an environmental review (§3.34(6)).

Check your specific North Stormont address →

Garden suite, laneway suite, in-law suite, ARU, ADU — different names for the same thing: a small, self-contained home in the backyard. New to the idea? Start with prefab garden suites for Ontario — what one costs in North Stormont, and the models that fit →

North Stormont's by-law is verified in our checker, so you can check if a garden suite is allowed at your North Stormont address in about a minute.

Permits

Getting your building permit in North Stormont

An eligible lot still needs a building permit before anything is delivered. Here's how North Stormont's process actually works — verified against the North Stormont building department's own pages.

How do you apply for an ADU building permit in North Stormont?

Through Paper or email application (Township of North Stormont Building Department) (application portal ↗). Download the fillable Building Permit Application from the Township's Building Permits page and email it to the Building Department or drop it off at the Township office, or fill it in at the office with staff's help. The Building Department is at 613-984-2821 ext. 225. On a well and septic, the South Nation Conservation septic permit comes first. North Stormont's building-permit page ↗

  1. Confirm zoning with the Township's Community Planner: under Zoning By-law 08-2014 §3.15 a detached secondary unit is permitted beside a house in the R1 to R4 zones and the Agricultural and Rural zones, but not in the Rural Residential (RR) zone
  2. Sort out servicing. In Finch, Crysler and Moose Creek, apply to the Township for a water and wastewater capacity allocation. Everywhere else, apply to South Nation Conservation for a septic permit where the system has to be added to, altered or replaced
  3. Where the lot is near a river, creek, municipal drain, wetland or mapped flood plain, get South Nation Conservation's or Raisin Region Conservation Authority's approval; in a municipal wellhead protection area, SNC reviews the project for the Township; along a County Road, get the SDG Counties setback and entrance permits
  4. Have a BCIN-qualified designer (or an architect or engineer) prepare two sets of plans: floor plans, all four elevations, a cross-section, wall sections and construction specifications, with an engineer-stamped truss design if trusses are used
  5. Submit the signed application with the plans, a detailed site plan, the Energy Efficiency Design Summary, a copy of the deed and a survey of the property
  6. Give the Building Department at least 48 hours' notice to book each inspection the permit lists

What does an ADU permit application in North Stormont need?

  • Completed and signed Township Building Permit Application
  • Energy Efficiency Design Summary
  • Two complete sets of plans to scale, with the designer's BCIN number: floor plans of every level, all four elevations, a cross-section, wall sections and construction specifications
  • Detailed site plan (plot plan): every existing and proposed building, separation distances between buildings, the septic and well, north arrow and street name, watercourses, ditches and municipal drains, and hydro or gas lines
  • A copy of the deed (land title) and a survey plan of the property
  • South Nation Conservation sewage system permit (private services) or the Township capacity allocation and service connection permit (municipal services)
  • Entrance permit (Township, or SDG Counties on a County Road), County Road setback documents, and an SNC letter of authorization in a wellhead protection area, where they apply

How much does an ADU building permit cost in North Stormont?

Estimate: we couldn't confirm the current building-permit rate. The Township's posted User Fees By-law 42-2019 set new residential construction, mobile homes and modular homes at $0.69 per sq ft of gross floor area plus a $50 application fee from January 1, 2019, and says fees rise each year with the cost of living, so today's rate is higher. Ask the Building Department (613-984-2821 ext. 225) for the current figure before you budget. In Finch, Crysler and Moose Creek, the Township's 2025 capacity allocation form charges $250 to apply for water and sewer together and says a $5,000 water and $5,000 sewer capital connection fee per unit is paid at building permit, which is the larger cost; ask whether a backyard unit is charged as a new unit.

Building permit (User Fees By-law 42-2019, Schedule "B", indexed yearly)Current rate not published. The 2019 rate was $0.69 per sq ft of gross floor area plus a $50 application fee, with a cost-of-living increase added each year; confirm with the Building Department
Water and wastewater capacity allocation application (Finch, Crysler, Moose Creek)$250 for water and wastewater together, $175 for one service (form updated June 2025)
Water and sewer capital connection (Finch, Crysler, Moose Creek)$5,000 water and $5,000 sewer per unit, paid at building permit, per the Township's capacity allocation form; confirm whether a secondary unit counts as a unit
Septic permit (South Nation Conservation)Set by SNC's own fee schedule; SNC decides whether the house's existing system can take the unit

How long does an ADU building permit take in North Stormont?

Ontario's Building Code requires a decision on a complete house-class application within 10 business days. A detached backyard suite is a house-class (Ontario Building Code Part 9) permit, so the legislated review window is 10 business days once the application is complete. The Township publishes no typical turnaround. Add lead time for the South Nation Conservation septic permit or the Township capacity allocation, and for any conservation-authority or SDG Counties approval.

Registration: No separate registration of secondary units was found for North Stormont. The building permit is the approval; a new building on its own driveway may need a civic number, so confirm with the Township.

Worth knowing before you apply

  • Plan a 4 m setback: any rear or side wall of the suite with a window or door has to be 4 m from the lot line it faces (§3.15(10)); 1.2 m applies only to a blank wall
  • The Rural Residential (RR) zone doesn't list a secondary unit, so an RR lot needs a rezoning or minor variance first
  • In Finch, Crysler and Moose Creek, capacity in the water and sewer systems is allocated by application; apply before you order the unit
  • Build to CSA A277 (modular) or on site. The by-law calls a CSA Z240 home a "mobile home" and allows one only in the mobile-home zones and a few site exceptions (§3.23)
  • Ask for a "Dwelling – Secondary Unit (Detached)", not a "garden suite": in this by-law a garden suite is a portable home approved only as a temporary use
  • Along a County Road every building stays 30 m from the road's centreline, and you need SDG Counties' setback permit (§3.34(1)(b))
  • Electrical work needs a separate permit from the Electrical Safety Authority, not the Township

Fees and timelines are estimates from North Stormont's published schedules, verified November 16, 2026. Rates and processes change — always confirm current requirements with the building department before you apply.

Check what your North Stormont lot allows first →Talk to our team about your build
Well & septic

A garden suite on a well and septic in North Stormont

Can I add a garden suite on a septic system in North Stormont?

Yes, if your septic system can carry the house and the suite together. A garden suite with a kitchen and bathroom adds a new source of sewage, so a qualified septic designer checks the combined load before you order. If the system has room, the suite can connect to it; if not, it may need to be altered, expanded or replaced.

In North Stormont: The septic check has to be in writing (a septic capacity letter) before the building permit is issued.

Who approves septic systems in North Stormont?

South Nation Conservation, the conservation authority, approves septic systems in North Stormont on the municipality’s behalf, so the septic review is a separate desk from the building permit.

South Nation Conservation: septic permits ↗ · 613-984-2948 · info@nation.on.ca

What to gather, and why even a small suite needs the check: our guide to garden suites on a septic system →

From South Nation Conservation’s own page, checked November 16, 2026. Confirm with them before you apply.

Grants & financing in North Stormont

See every program → Ontario ADU Grants Directory

A modular or prefab home on a permanent foundation is financed like any house. CMHC Prefab Plus allows an insured mortgage with as little as 5% down on the first $500,000, with up to four progress advances. How modular home financing works →

Adding the suite to a home you already own? CMHC Refinance can help homeowners add a secondary suite to their existing home. How CMHC Refinance works →

Thinking of the suite as a rental? Run the numbers →

North Stormont modular homes — FAQ

Can you build a garden suite in North Stormont?

Yes. North Stormont's Zoning By-law 08-2014 (§3.15) allows one secondary unit beside a single-detached, semi-detached, duplex or end-unit townhouse in the R1 to R4 residential zones (Finch, Crysler, Berwick, Moose Creek and the other villages) and in the Agricultural and Rural zones. It can be inside the house or in a separate building in the yard, once the house is built. The Rural Residential (RR) zone doesn't list one.

How big can a garden suite be in North Stormont?

There's no fixed cap: the suite can be no larger than your house. On a residential lot all accessory buildings together, the suite included, may cover no more than 10% of the lot, so a 1,000 m² village lot allows 100 m² (≈1,076 sq ft) less any garage or shed. It's up to 5 m (≈16 ft) tall. On a farm or Rural lot there's no accessory cap, and it can be 6.1 m (20 ft) tall where it meets the house's own yard setbacks.

Can you build a garden suite on a well and septic in North Stormont?

Yes. The Township must be satisfied the water supply and sewage disposal are adequate for the suite, and South Nation Conservation issues the septic permit for all of North Stormont. Talk to SNC early: the septic usually decides where the suite can go.

Can you put a modular home in North Stormont, Ontario?

Yes. The by-law counts a CSA A277 modular home on a permanent foundation as a single detached dwelling, as the main house or as a garden suite. A home built to CSA Z240 is a different case: the by-law calls it a "mobile home" and allows one only in the mobile-home zones and a few site-specific exceptions, so elsewhere it needs a rezoning.

How much does a modular home or backyard suite cost in North Stormont?

Modular home models start at $175,696 and run to about $338,000 for the largest layouts; backyard ADU models start at $96,244. Site work, foundation, delivery, and permits are additional.

Can I get a mortgage on a modular home in North Stormont?

Yes — on a permanent foundation it is financed as real property, including via CMHC Prefab Plus (5% down on the first $500,000).

Local rules summarized from Township of North Stormont Comprehensive Zoning By-law 08-2014, §3.15 Garden Suites & Dwelling - Secondary Units, with §3.1 accessory buildings (October 2021 consolidation); verified by Modular Homes 400 and reviewed by James Clarke, REALTOR®. Always confirm current requirements with the municipality before you build.

Find your match in 90 seconds →Talk to our team