HST rebates may apply on a new modular home
A modern modular home with wood and white cladding on a permanent foundation in a leafy Ontario backyard at golden hour

Home/Modular Homes by City/Severn

Serving the Township of Severn & Simcoe County

Modular Homes & Garden Suites in Severn, Ontario

Factory-direct modular homes and backyard suites for the Township of Severn — Coldwater, Washago, Port Severn, Westshore, Fesserton, Marchmont, Ardtrea, and the surrounding communities. New for 2026: Severn's zoning update (By-law 2026-40, in force June 2026) permits a detached additional residential unit as-of-right across the Township, on municipal services or a private well & septic. Here's what the by-law allows, what it costs, and the rules that apply.

What you can build in Severn

Full modular homes — from $175,696. 29 models from 560 to 1,405 sq ft, 1–3 bedrooms — factory-built to the Ontario Building Code and set on a permanent foundation (a real, permanent house, not a “trailer”).

Backyard suites (ADUs) — from $96,244. 7 compact models built for garden-suite and in-law-suite use, sized to fit what Severn's by-law allows.

All homes are CSA-certified (A277 modular / Z240MH manufactured), finished in the factory, and delivered ready for foundation and hook-up. What's the difference between modular, manufactured, and mobile? →

Modular Match

Find your backyard suite — 3 quick questions

We'll narrow the models that fit a typical Severn backyard allowance to the ones that fit your life. No email needed.

1 · Who's it for?

2 · What layout?

3 · What size feels right? (Severn lots typically allow up to ~1,000 sq ft)

Severn caps a detached suite at the lesser of 75% of your home’s floor area or 110 m² (≈1,184 sq ft). It’s not permitted on the non-serviced or restricted shoreline zones (SR2/SR3) or in a waterfront front yard, and Coldwater has a mapped Coldwater River floodplain to check — enter your address for the specifics. Your exact lot may allow more or less — get the real number for your address in seconds.

Check your exact Severn address →

Can you put a garden suite (ADU) in your Severn backyard?

Often, yes — Severn permits a detached Additional Residential Unit on most serviced residential lots. The specifics, from Township of Severn Comprehensive Zoning By-law 2010-65 §3.3 Additional Residential Units (added as-of-right by By-law 2026-40, in force June 3, 2026):

Max sizeThe lesser of 75% of your home’s floor area or 110 m² (≈1,184 sq ft)
Max height5.0 m (≈16 ft), one storey — up to 8 m (≈26 ft) with the suite in an upper half-storey/second storey, and never taller than your main house
SetbacksFollow the zone’s principal-building yard setbacks (not the smaller accessory-building ones) · 3.0 m (≈10 ft) separation from any other building with a dwelling · in the rural zones, within 75 m (≈246 ft) of the main house
Units per lotUp to 2 additional units (one in the house + one detached) — 3 units in total with the main house; only one may be detached
Parking1 space per additional unit (tandem allowed)
Where allowedAs-of-right in the R1, R2, RM1, ER, SR1, RR, AG, RU and GL zones — NOT in the SR2/SR3 shoreline zones or a waterfront front yard
ServicingPrivate well & septic permitted (with an OBC septic-capacity review); on municipal services in Coldwater/Washago, an annual ARU servicing allocation applies
ConservationLake Simcoe Region CA in southern Severn; much of the Coldwater River corridor is outside any regulated CA (Severn Sound Environmental Association monitors but doesn’t issue permits)

Check your specific Severn address →

Permits

Getting your building permit in Severn

An eligible lot still needs a building permit before anything is delivered. Here's how Severn's process actually works — verified against the Severn building department's own pages.

How do you apply for an ADU building permit in Severn?

Through Email submission (no online portal — NOT Cloudpermit). Severn does not use Cloudpermit. Email your complete PDF application package (the application form + Schedule 1 designer info + all drawings) to buildingpermits@severn.ca; in-person by pre-scheduled appointment (drawings emailed first) or by mail are the alternatives. Staff don't start reviewing a permit until the application is complete. Severn's building-permit page ↗

  1. Confirm zoning FIRST with Planning (planning@severn.ca, 705-325-2315 x246) — Severn strongly recommends this before you design or apply; a non-complying lot needs a minor variance or rezoning
  2. Retain a qualified BCIN designer for the construction drawings (a Schedule 1: Designer Information form is required)
  3. On a private-septic lot, have a licensed septic designer prepare the septic design + flow calculations and a Schedule 2: Septic Designer form — this is how the added unit's flow is shown to fit the system
  4. Have an engineered lot grading plan prepared (required for every new dwelling unit)
  5. Email the complete PDF package to buildingpermits@severn.ca — the Township won't begin review until the application is complete
  6. Respond to any plan-review deficiencies, then pay all fees (no permit is issued until fees are paid)
  7. Book inspections at severn.ca/inspections with two business days' notice

What does a Severn ADU permit application need?

  • Application for a Permit to Construct or Demolish (one per structure) + Schedule 1: Designer Information
  • Site plan showing all structures, setbacks to the lot lines, and the septic system and well
  • Floor plans + digital construction drawings, an HVAC plan with heat loss/gain, the engineered truss/floor package, an Energy Efficiency Design Summary (EEDS), and plumbing drawings
  • Digital engineered Lot Grading Plan
  • Schedule 2: Septic Designer information + septic design drawings + septic flow calculations (on a private well+septic lot)
  • Letter of Authorization if the applicant is not the owner

How much does an ADU building permit cost in Severn?

Estimate for a ~700 sq ft detached ADU: roughly $1,190 for the building permit ($180 base + $1.44/sq ft) plus about $723 for a new septic system, $12.50 per plumbing fixture, and a $3,647 refundable lot-grading deposit. Figures from Severn Building By-law 2021-91 Schedule "A" (fees updated January 1, 2026, indexed annually) — confirm current-year figures with the Building Department.

Base application fee$180 per permit (Building By-law 2021-91 Sch. "A" §1.1)
Building permit — dwelling unit$1.44 per sq ft, Group C dwelling (Sch. "A" §4.7) — a detached ADU is a dwelling unit, so a ~700 sq ft suite ≈ $1,008 plus the $180 base
New septic system$723 flat for a new Class 3/4 sewage system (Sch. "A" §8.2); a capacity review of an existing system is $108/hr, min 1 hr
Plumbing$12.50 per fixture (Sch. "A" §7.1)
Lot grading deposit$3,647 refundable per lot (Sch. "A" §14.2)

A qualifying detached ADU (one unit ancillary to the house) is EXEMPT from Township development charges under Severn DC By-law 2024-47 §3.5(d)/(g) (the Bill 23 / More Homes Built Faster framework); County of Simcoe and school-board DCs follow the same provincial ADU exemption. For contrast, a NEW principal single-detached dwelling carries roughly $38,816 in combined DCs (Township + County + school boards, Building Permit Guide Table 1) — the ADU itself avoids that.

How long does an ADU building permit take in Severn?

Ontario's Building Code requires a decision on a complete house-class application within 10 business days. A detached ADU is OBC Part 9 (house class), so the legislated review window is 10 business days for a complete application; Severn advises applying well in advance because summer volumes extend review times. Inspections need two business days' notice.

Worth knowing before you apply

  • Severn is email-submission, NOT Cloudpermit — send your complete PDF package to buildingpermits@severn.ca, and note that departments don't review anything until the application is complete
  • Talk to Planning before you design: Severn strongly recommends confirming the lot's zoning permits the ADU up front (planning@severn.ca) — a non-complying lot means a minor variance or rezoning first
  • Septic capacity is the binding gate on most Severn lots — Severn's OWN Building Department is the Part 8 septic authority (not the health unit), and a licensed septic designer's Schedule 2 + flow calculations are how the added unit is shown to fit
  • A qualifying detached ADU is EXEMPT from Township development charges (DC By-law 2024-47 §3.5) — a real saving versus a new principal dwelling
  • Budget the $3,647 lot-grading deposit per lot — it's refundable, but you need the cash up front
  • Coldwater-area and waterfront lots can face extra review — LSRCA regulates southern Severn and the Coldwater River floodplain may apply; conservation applicability is address-specific, so confirm per-address before you design
  • The entrance/driveway permit fee (if a new access is needed) is a separate Public Works charge — on a County road it's billed by the County of Simcoe — and the exact figure isn't published online; confirm it directly

Fees and timelines are estimates from Severn's published schedules, verified July 7, 2026. Rates and processes change — always confirm current requirements with the building department before you apply.

Check what your Severn lot allows first →Talk to our team about your build

Grants & financing in Severn

County of Simcoe Secondary Suites ProgramSimcoe County offers a 15-year forgivable loan (recent materials cite up to $30,000–$50,000/unit — confirm the current cap) to create a secondary or garden suite rented to an income-qualified tenant. Severn is in Simcoe County, so Township properties qualify.

See every program → Ontario ADU Grants Directory

A modular or prefab home on a permanent foundation is financed like any house. CMHC Prefab Plus allows an insured mortgage with as little as 5% down on the first $500,000, with construction funds released in stages. How modular home financing works →

Thinking of the suite as a rental? Run the numbers →

Severn modular homes — FAQ

Can you put a garden suite in Severn (Coldwater, Port Severn…)?

Yes. Since By-law 2026-40 (June 2026) Severn permits a detached additional residential unit as-of-right across the Township — in the residential, rural and agricultural zones — subject to the size, height, and setback rules and a building permit. It is not permitted on the non-serviced/restricted shoreline zones (SR2/SR3) or in a waterfront front yard.

How big can a garden suite be in Severn?

A detached suite is capped at the lesser of 75% of your home’s floor area or 110 m² (≈1,184 sq ft), one storey and 5.0 m tall (up to 8 m with the suite in an upper storey). Check your address for the specifics — a Coldwater lot may also carry a floodplain overlay.

Can you build an ADU on well and septic in Severn?

Yes. Most of Severn is on private well and septic, and a detached suite is permitted on private services — the added unit’s sewage flow just has to fit your septic system under the Ontario Building Code (Part 8 review).

Can you put a modular home in Severn, Ontario?

Yes. On land you own, a modular home on a permanent foundation is legal residential housing under the Ontario Building Code throughout Severn — the by-law now defines a CSA A277 “Modular Home” distinctly from a mobile home or park-model trailer.

How much does a modular home or backyard suite cost in Severn?

Modular home models start at $175,696 and run to about $338,000 for the largest layouts; backyard ADU models start at $96,244. Site work, foundation, delivery, and permits are additional.

Can I get a mortgage on a modular home in Severn?

Yes — on a permanent foundation it is financed as real property, including via CMHC Prefab Plus (5% down on the first $500,000).

Local rules summarized from Township of Severn Comprehensive Zoning By-law 2010-65 §3.3 Additional Residential Units (added as-of-right by By-law 2026-40, in force June 3, 2026); verified by Modular Homes 400 and reviewed by James Clarke, REALTOR®. Always confirm current requirements with the City of Severn before you build.

Find your match in 90 seconds →Talk to our team