
Home/Modular Homes by City/Tay Valley
Serving Tay Valley Township (Glen Tay, Maberly, Bolingbroke, Stanleyville — Lanark County)
Modular Homes & Garden Suites in Tay Valley, Ontario
Factory-direct modular homes and backyard suites for Tay Valley Township — the lake country west of Perth, taking in Glen Tay, Maberly, Bolingbroke, Fallbrook and Stanleyville and the shores of Christie, Otty and Bobs Lakes. The Township's Zoning By-law 02-121 permits a second dwelling as-of-right, either inside the house or in its own building in the yard, on any lot where a house is allowed. Every lot in Tay Valley is on a private well and septic, and the suite shares the house's. Here's what the by-law allows, what it costs, and the rules that apply.
Last updated
What you can build in Tay Valley
Full modular homes — from $175,696. 29 models from 560 to 1,405 sq ft, 1–3 bedrooms — factory-built to the Ontario Building Code and set on a permanent foundation (a real, permanent house, not a “trailer”).
Building a main house in Tay Valley? Tay Valley's zoning by-law doesn't allow a CSA Z240MH manufactured home, which is what these full-size models are, as the main house in its ordinary residential zones (a few zones are different, so check your lot). ModularHomes400 has main-house alternatives coming. Tell us about your lot and we'll recommend one as they arrive. Backyard suites follow their own rules, below.
Backyard suites (ADUs) — from $96,244. 7 compact models built for garden-suite and in-law-suite use, sized to fit what Tay Valley's by-law allows.
All homes are CSA-certified (A277 modular / Z240MH manufactured), finished in the factory, and delivered ready for foundation and hook-up. What's the difference between modular, manufactured, and mobile? →
Find your backyard suite — 3 quick questions
We'll narrow the models that fit a typical Tay Valley backyard allowance to the ones that fit your life. No email needed.
1 · Who's it for?
2 · What layout?
3 · What size feels right? (Tay Valley lots typically allow up to ~600 sq ft)
Tay Valley caps a second dwelling at 50% of your house’s floor area and never more than 80 m² (≈860 sq ft) in the residential zones or 95 m² (≈1,020 sq ft) in the Rural and Agriculture zones (§3.19), so a 1,200 sq ft house allows about 600 sq ft. It’s capped at 5 m high. Enter your address for the specifics. Your exact lot may allow more or less — get the real number for your address in seconds.
Check your exact Tay Valley address →Can you put a garden suite (ADU) in your Tay Valley backyard?
Often, yes — Tay Valley permits one second dwelling, inside the house or in its own building, on any lot where a house is allowed, sharing the house’s well and septic. The specifics, from Tay Valley Township Comprehensive Zoning By-law 02-121 (office consolidation October 26, 2018), §3.19 — Second Dwelling Unit and Second Dwelling (added by By-law 2018-041):
| Max size | Half the floor area of your house, up to 80 m² (≈860 sq ft) in the General Residential and Limited Services Residential zones or 95 m² (≈1,020 sq ft) in the Rural and Agriculture zones (§3.19). |
|---|---|
| Where it goes | One second unit per lot: either inside the house or in a separate building, not both. A detached second dwelling must sit less than 12 m (≈39 ft) from the house, and at least 1 m from it. Not on Seasonal Residential lots, which allow only a cottage. |
| Height & setbacks | Max 5 m (≈16 ft) tall. It meets the house’s yards: 10 m front, 6 m (≈20 ft) side and 7.5 m rear in the residential and Rural zones; 15 m front and rear in the Agriculture zone. It counts toward lot coverage. |
| Parking | 1 extra space, using the house’s driveway entrance (§3.19). |
| Servicing | The second dwelling must connect to the house’s own well and septic system, and you need a septic approval from the Mississippi Rideau Septic System Office (Mississippi Valley Conservation Authority) before the building permit. |
| Water & conservation | Nothing, including a septic bed, within 30 m (≈98 ft) of a lake or river’s high-water mark (§3.29), and 120 m from a wetland zoned Environmental Protection unless a study supports less. Mississippi Valley or Rideau Valley Conservation Authority permits may apply near water. |
| Road access | A new building generally needs frontage on a year-round maintained public road (§3.4). On a private lane, check with the Township’s Planner before you design. |
Check your specific Tay Valley address →
Garden suite, laneway suite, in-law suite, ARU, ADU — different names for the same thing: a small, self-contained home in the backyard. New to the idea? Start with prefab garden suites for Ontario — what one costs in Tay Valley, and the models that fit →
Tay Valley's by-law is verified in our checker, so you can check if a garden suite is allowed at your Tay Valley address in about a minute.
Getting your building permit in Tay Valley
An eligible lot still needs a building permit before anything is delivered. Here's how Tay Valley's process actually works — verified against the Tay Valley building department's own pages.
How do you apply for an ADU building permit in Tay Valley?
Through Online through the Township's CGIS permit portal, or a printed application at the Township office (application portal ↗). Apply online through the portal linked from the Township's Building Applications page, or hand in the printed 2026 Building Permit Application at the Township office, 217 Harper Road, Perth (613-267-5353). The Building Department suggests calling early in planning to confirm what your project needs. Tay Valley's building-permit page ↗
- Check your zone on the Township's zoning map and Zoning By-law 02-121 §3.19: a second dwelling is allowed where a single dwelling is (the R, RLS, RU and A zones), at most 50% of the house's floor area (80 m² or 95 m² by zone), 5 m high and less than 12 m from the house
- Confirm the lot fronts a year-round maintained public road, or ask the Planner about your private road, and that the suite stays 30 m from any lake or river
- Get a septic approval from the Mississippi Rideau Septic System Office (Mississippi Valley Conservation Authority) for connecting the suite to the house's septic system, before the building permit
- Have a qualified designer prepare the Ontario Building Code drawings, Schedule 1 designer information, energy efficiency summary, heat loss and duct design and plumbing information
- Complete the Township's Planning and Zoning Review form and site sketch, showing setbacks, the septic system, the well and the tree cover to be removed
- Apply online or at the Township office, pay the permit fee and the refundable security deposit
- Book the required inspections as construction proceeds, through to the final inspection
What does an ADU permit application in Tay Valley need?
- Building Permit Application (2026) and Schedule 1: Designer Information
- Property Index Map, the registered deed and any survey (RS) documents
- Site sketch: lot size and dimensions, setbacks to every lot line, existing and proposed buildings, right-of-ways and easements, power lines, driveway, septic system and well
- Planning and Zoning Review form, and a Letter of Authorization if someone applies for you
- Building drawings (foundation, floor plans, elevations, cross section), floor joist layout, truss plans, heat loss and duct design, plumbing information and an Energy Efficiency Design Summary
- Septic permit from the Mississippi Rideau Septic System Office for a new system or a change of use
How much does an ADU building permit cost in Tay Valley?
As an estimate for a typical ~600 sq ft backyard suite: if the Township applies its single detached dwelling rate of $0.80 per sq ft of living space (2026), the building permit is about $480, plus plumbing at $10 per fixture with a $150 minimum, and a refundable $750 security deposit ($1,500 on a property with a site plan control agreement). The schedule has no line written for a second dwelling, so confirm the rate with the Building Department before you budget. Add the conservation authority's septic fee: about $350 to review a change of use to an existing system, or $990 plus $155 for a new Class 4 system.
| Building permit, single detached dwelling living space (2026) | $0.80 per sq ft of gross floor area; whether this line covers a second dwelling is not confirmed |
|---|---|
| Plumbing (2026) | $10 per fixture, $150 minimum |
| Minimum permit fee (2026) | $150 |
| Refundable security deposit (2026) | $750 for a new dwelling without a site plan control agreement; $1,500 with one |
| Septic permit (conservation authority, 2026) | $350 for a renovation or change-of-use review of an existing system; $990 for a new Class 4 residential system plus $155 to register its maintenance contract |
The Development Charges Act exempts one residential unit in a building ancillary to an existing detached, semi-detached or row house (s.2(3.2)), so a qualifying backyard suite pays no development charge. Confirm with the Township before you budget.
How long does an ADU building permit take in Tay Valley?
Ontario's Building Code requires a decision on a complete house-class application within 10 business days. The Township's Guide to Building says the Chief Building Official must issue or refuse a complete application for a house, or a detached structure serving it of up to 55 m², within 10 business days; a larger detached building falls under a longer window.
Worth knowing before you apply
- The 2026 fee schedule has no line written for a second dwelling; ask the Building Department which rate applies before budgeting
- The second dwelling must use the house's existing well and septic system, so the septic approval comes first and may require an upgrade
- A new building generally needs frontage on a year-round maintained public road; on a private lane, talk to the Planner first
- Nothing, including a septic bed, may be built within 30 m of a lake or river; work near water may also need a conservation authority permit
- A zoning amendment proposed in 2026 would change these rules; ask whether it has passed before you order drawings
Fees and timelines are estimates from Tay Valley's published schedules, verified November 21, 2026. Rates and processes change — always confirm current requirements with the building department before you apply.
A garden suite on a well and septic in Tay Valley
Can I add a garden suite on a septic system in Tay Valley?
Yes, if your septic system can carry the house and the suite together. A garden suite with a kitchen and bathroom adds a new source of sewage, so a qualified septic designer checks the combined load before you order. If the system has room, the suite can connect to it; if not, it may need to be altered, expanded or replaced.
In Tay Valley: The septic check has to be in writing (a septic capacity letter) before the building permit is issued.
Who approves septic systems in Tay Valley?
Mississippi Valley Conservation Authority, the conservation authority, approves septic systems in Tay Valley on the municipality’s behalf, so the septic review is a separate desk from the building permit.
Mississippi Valley Conservation Authority: septic permits ↗ · 613-253-0006
What to gather, and why even a small suite needs the check: our guide to garden suites on a septic system →
From Mississippi Valley Conservation Authority’s own page, checked November 21, 2026. Confirm with them before you apply.
Grants & financing in Tay Valley
Development-charge exemption — The Development Charges Act exempts one unit in a building ancillary to an existing detached, semi-detached or row house, so a qualifying backyard suite pays no development charge. Confirm with the Township for your project.
See every program → Ontario ADU Grants Directory
A modular or prefab home on a permanent foundation is financed like any house. CMHC Prefab Plus allows an insured mortgage with as little as 5% down on the first $500,000, with up to four progress advances. How modular home financing works →
Adding the suite to a home you already own? CMHC Refinance can help homeowners add a secondary suite to their existing home. How CMHC Refinance works →
Thinking of the suite as a rental? Run the numbers →
Tay Valley modular homes — FAQ
Can you build a garden suite / ADU in Tay Valley?
Yes. Zoning By-law 02-121 (§3.19) permits one second dwelling, inside the house or in its own building in the yard, on any lot where a single, semi-detached or townhouse dwelling is allowed. A detached one must be less than 12 m from the house, 5 m high at most, share the house’s well, septic and driveway, and have its own parking space. It needs a building permit. A zoning amendment proposed in 2026 would change these rules, so ask the Township whether it has passed.
How big can a garden suite be in Tay Valley?
Half your house’s floor area, up to 80 m² (≈860 sq ft) in the residential zones or 95 m² (≈1,020 sq ft) in the Rural and Agriculture zones. A 1,200 sq ft house allows about 600 sq ft. Enter your address for the specifics.
Can you build an ADU on well and septic in Tay Valley?
Yes, and every lot in Tay Valley is on private services. The second dwelling must connect to the same well and septic system as the house, and you need a septic approval from the Mississippi Rideau Septic System Office before the building permit; the existing system may need an upgrade. No septic bed may sit within 30 m of a lake or river.
Can you put a modular home in Tay Valley, Ontario?
A CSA A277 modular home on a permanent foundation is an ordinary house under the by-law. A home built to CSA Z240 is a different case: the by-law defines it as a mobile home, counts it as a vehicle rather than a dwelling, and allows it only in the Mobile Home Park zone. Check which standard your model is built to before you order.
How much does a modular home or backyard suite cost in Tay Valley?
Modular home models start at $175,696 and run to about $338,000 for the largest layouts; backyard ADU models start at $96,244. Site work, foundation, delivery, and permits are additional.
Can I get a mortgage on a modular home in Tay Valley?
Yes — on a permanent foundation it is financed as real property, including via CMHC Prefab Plus (5% down on the first $500,000).
Local rules summarized from Tay Valley Township Comprehensive Zoning By-law 02-121 (office consolidation October 26, 2018), §3.19 — Second Dwelling Unit and Second Dwelling (added by By-law 2018-041); verified by Modular Homes 400 and reviewed by James Clarke, REALTOR®. Always confirm current requirements with the municipality before you build.